Track Actual Costs

Project #22 🔒 Locked 🔓 Admin Edit Mode
← Back to Dashboard
Project: Media Replacement for REnal RO pretreatment
Customer: Buraidah Future
Date Created: 2026-03-28
Seq Description Qty Est. Cost Actual Unit Cost Actual Total Variance Details
1 Magnetic Contactor 1 350.00
Cost Breakdown: Magnetic Contactor
Sub-Item Description Notes Link (URL) Cost Qty Total
2 Brim Iron Media 3 450.00
Cost Breakdown: Brim Iron Media
Sub-Item Description Notes Link (URL) Cost Qty Total
3 WS1 Head 1 900.00
Cost Breakdown: WS1 Head
Sub-Item Description Notes Link (URL) Cost Qty Total
4 Brine Salt 50 35.00
Cost Breakdown: Brine Salt
Sub-Item Description Notes Link (URL) Cost Qty Total
5 Silica Sand 1 200.00
Cost Breakdown: Silica Sand
Sub-Item Description Notes Link (URL) Cost Qty Total
6 Cartridge Filter 24 25.00
Cost Breakdown: Cartridge Filter
Sub-Item Description Notes Link (URL) Cost Qty Total
7 materials and consumable 1 500.00
Cost Breakdown: materials and consumable
Sub-Item Description Notes Link (URL) Cost Qty Total
8 Manpower and Mobilization 1 4,500.00
Cost Breakdown: Manpower and Mobilization
Sub-Item Description Notes Link (URL) Cost Qty Total
Total Est. Cost: 0.00
Total Actual Cost: 0.00
Total Cost Variance: 0.00