Track Actual Costs
Project #22
🔒 Locked
🔓 Admin Edit Mode
← Back to Dashboard
Project:
Media Replacement for REnal RO pretreatment
Customer:
Buraidah Future
Date Created:
2026-03-28
Seq
Description
Qty
Est. Cost
Actual Unit Cost
Actual Total
Variance
Details
1
Magnetic Contactor
1
350.00
+ Add
Cost Breakdown:
Magnetic Contactor
Sub-Item Description
Notes
Link (URL)
Cost
Qty
Total
+ Add Sub-Item
2
Brim Iron Media
3
450.00
+ Add
Cost Breakdown:
Brim Iron Media
Sub-Item Description
Notes
Link (URL)
Cost
Qty
Total
+ Add Sub-Item
3
WS1 Head
1
900.00
+ Add
Cost Breakdown:
WS1 Head
Sub-Item Description
Notes
Link (URL)
Cost
Qty
Total
+ Add Sub-Item
4
Brine Salt
50
35.00
+ Add
Cost Breakdown:
Brine Salt
Sub-Item Description
Notes
Link (URL)
Cost
Qty
Total
+ Add Sub-Item
5
Silica Sand
1
200.00
+ Add
Cost Breakdown:
Silica Sand
Sub-Item Description
Notes
Link (URL)
Cost
Qty
Total
+ Add Sub-Item
6
Cartridge Filter
24
25.00
+ Add
Cost Breakdown:
Cartridge Filter
Sub-Item Description
Notes
Link (URL)
Cost
Qty
Total
+ Add Sub-Item
7
materials and consumable
1
500.00
+ Add
Cost Breakdown:
materials and consumable
Sub-Item Description
Notes
Link (URL)
Cost
Qty
Total
+ Add Sub-Item
8
Manpower and Mobilization
1
4,500.00
+ Add
Cost Breakdown:
Manpower and Mobilization
Sub-Item Description
Notes
Link (URL)
Cost
Qty
Total
+ Add Sub-Item
Total Est. Cost:
0.00
Total Actual Cost:
0.00
Total Cost Variance:
0.00
📄 Print / PDF
Save Actuals