Track Actual Costs

Project #25 🔒 Locked 🔓 Admin Edit Mode
← Back to Dashboard
Project: Pretreatment Full Replacement
Customer: Lehbi Renal Dialysis
Date Created: 2026-04-14
Seq Description Qty Est. Cost Actual Unit Cost Actual Total Variance Details
1 Resin 12 275.00
Cost Breakdown: Resin
Sub-Item Description Notes Link (URL) Cost Qty Total
2 Berim 4 220.00
Cost Breakdown: Berim
Sub-Item Description Notes Link (URL) Cost Qty Total
3 Carbon 8 210.00
Cost Breakdown: Carbon
Sub-Item Description Notes Link (URL) Cost Qty Total
4 Sand 6 35.00
Cost Breakdown: Sand
Sub-Item Description Notes Link (URL) Cost Qty Total
5 control ws 1.5 2 2,800.00
Cost Breakdown: control ws 1.5
Sub-Item Description Notes Link (URL) Cost Qty Total
6 Alternator 1 2,500.00
Cost Breakdown: Alternator
Sub-Item Description Notes Link (URL) Cost Qty Total
7 Plumming Material 1 1,000.00
Cost Breakdown: Plumming Material
Sub-Item Description Notes Link (URL) Cost Qty Total
8 Manpower 10 400.01
Cost Breakdown: Manpower
Sub-Item Description Notes Link (URL) Cost Qty Total
9 Flowmeter 1 1,500.00
Cost Breakdown: Flowmeter
Sub-Item Description Notes Link (URL) Cost Qty Total
Total Est. Cost: 0.00
Total Actual Cost: 0.00
Total Cost Variance: 0.00