Track Actual Costs
Project #25
🔒 Locked
🔓 Admin Edit Mode
← Back to Dashboard
Project:
Pretreatment Full Replacement
Customer:
Lehbi Renal Dialysis
Date Created:
2026-04-14
Seq
Description
Qty
Est. Cost
Actual Unit Cost
Actual Total
Variance
Details
1
Resin
12
275.00
+ Add
Cost Breakdown:
Resin
Sub-Item Description
Notes
Link (URL)
Cost
Qty
Total
+ Add Sub-Item
2
Berim
4
220.00
+ Add
Cost Breakdown:
Berim
Sub-Item Description
Notes
Link (URL)
Cost
Qty
Total
+ Add Sub-Item
3
Carbon
8
210.00
+ Add
Cost Breakdown:
Carbon
Sub-Item Description
Notes
Link (URL)
Cost
Qty
Total
+ Add Sub-Item
4
Sand
6
35.00
+ Add
Cost Breakdown:
Sand
Sub-Item Description
Notes
Link (URL)
Cost
Qty
Total
+ Add Sub-Item
5
control ws 1.5
2
2,800.00
+ Add
Cost Breakdown:
control ws 1.5
Sub-Item Description
Notes
Link (URL)
Cost
Qty
Total
+ Add Sub-Item
6
Alternator
1
2,500.00
+ Add
Cost Breakdown:
Alternator
Sub-Item Description
Notes
Link (URL)
Cost
Qty
Total
+ Add Sub-Item
7
Plumming Material
1
1,000.00
+ Add
Cost Breakdown:
Plumming Material
Sub-Item Description
Notes
Link (URL)
Cost
Qty
Total
+ Add Sub-Item
8
Manpower
10
400.01
+ Add
Cost Breakdown:
Manpower
Sub-Item Description
Notes
Link (URL)
Cost
Qty
Total
+ Add Sub-Item
9
Flowmeter
1
1,500.00
+ Add
Cost Breakdown:
Flowmeter
Sub-Item Description
Notes
Link (URL)
Cost
Qty
Total
+ Add Sub-Item
Total Est. Cost:
0.00
Total Actual Cost:
0.00
Total Cost Variance:
0.00
📄 Print / PDF
Save Actuals