Project: Pretreatment Replacement
Customer: Buraidah Future
Date Created: 2026-04-23
Seq Description Qty Est. Cost Actual Unit Cost Actual Total Variance Details
1 Magnetic contactor 1 350.00
Cost Breakdown: Magnetic contactor
Sub-Item Description Notes Link (URL) Cost Qty Total
0.00
2 Filter Head WS1 1 900.00
Cost Breakdown: Filter Head WS1
Sub-Item Description Notes Link (URL) Cost Qty Total
0.00
3 Sand 8 50.00
Cost Breakdown: Sand
Sub-Item Description Notes Link (URL) Cost Qty Total
0.00
4 Carbon 2 250.00
Cost Breakdown: Carbon
Sub-Item Description Notes Link (URL) Cost Qty Total
0.00
5 Softener Resin 6 275.00
Cost Breakdown: Softener Resin
Sub-Item Description Notes Link (URL) Cost Qty Total
0.00
6 Brim 2 220.00
Cost Breakdown: Brim
Sub-Item Description Notes Link (URL) Cost Qty Total
0.00
7 Silica sand 1 200.00
Cost Breakdown: Silica sand
Sub-Item Description Notes Link (URL) Cost Qty Total
0.00
8 Materials and Consumables 1 1,000.00
Cost Breakdown: Materials and Consumables
Sub-Item Description Notes Link (URL) Cost Qty Total
0.00
9 Manpower and Mobilization 1 4,000.00
Cost Breakdown: Manpower and Mobilization
Sub-Item Description Notes Link (URL) Cost Qty Total
0.00
0.00
0.00
0.00
0.00
Total Est. Cost: 0.00
Total Actual Cost: 0.00
Total Cost Variance: 0.00