Track Actual Costs
Project #43
🔒 Locked
🔓 Admin Edit Mode
← Back to Dashboard
Project:
Sedu -2
Customer:
Sedu
Date Created:
2026-05-03
Seq
Description
Qty
Est. Cost
Actual Unit Cost
Actual Total
Variance
Details
1
Feed Pump 1.5hp Taiwan
1
800.00
+ Add
Cost Breakdown:
Feed Pump 1.5hp Taiwan
Sub-Item Description
Notes
Link (URL)
Cost
Qty
Total
+ Add Sub-Item
2
Cartridge Filter
2
350.00
+ Add
Cost Breakdown:
Cartridge Filter
Sub-Item Description
Notes
Link (URL)
Cost
Qty
Total
+ Add Sub-Item
3
Carbon Cartrdidge
1
350.00
+ Add
Cost Breakdown:
Carbon Cartrdidge
Sub-Item Description
Notes
Link (URL)
Cost
Qty
Total
+ Add Sub-Item
4
Softner
1
3,000.00
+ Add
Cost Breakdown:
Softner
Sub-Item Description
Notes
Link (URL)
Cost
Qty
Total
+ Add Sub-Item
5
RO 250 Taiwan Pump
1
12,000.00
+ Add
Cost Breakdown:
RO 250 Taiwan Pump
Sub-Item Description
Notes
Link (URL)
Cost
Qty
Total
+ Add Sub-Item
6
Tank 1000L
1
600.00
+ Add
Cost Breakdown:
Tank 1000L
Sub-Item Description
Notes
Link (URL)
Cost
Qty
Total
+ Add Sub-Item
7
Pumps with VFD Taiwan
2
1,350.00
+ Add
Cost Breakdown:
Pumps with VFD Taiwan
Sub-Item Description
Notes
Link (URL)
Cost
Qty
Total
+ Add Sub-Item
8
Material
1
3,000.00
+ Add
Cost Breakdown:
Material
Sub-Item Description
Notes
Link (URL)
Cost
Qty
Total
+ Add Sub-Item
9
Manpower
350
6.00
+ Add
Cost Breakdown:
Manpower
Sub-Item Description
Notes
Link (URL)
Cost
Qty
Total
+ Add Sub-Item
Total Est. Cost:
0.00
Total Actual Cost:
0.00
Total Cost Variance:
0.00
📄 Print / PDF
Save Actuals