Track Actual Costs

Project #49 🔒 Locked 🔓 Admin Edit Mode
← Back to Dashboard
Project: Pretreatment for Renal Dialysis
Customer: Mohammed Almasry
Date Created: 2026-05-17
Seq Description Qty Est. Cost Actual Unit Cost Actual Total Variance Details
1 Raw Tank 1000 L 1 2,800.00
Cost Breakdown: Raw Tank 1000 L
Sub-Item Description Notes Link (URL) Cost Qty Total
2 Booster Pump 1.5hp Booster duty/standby VFD 1 13,000.00
Cost Breakdown: Booster Pump 1.5hp Booster duty/standby VFD
Sub-Item Description Notes Link (URL) Cost Qty Total
3 Sand Filter 14 inch 1 930.00
Cost Breakdown: Sand Filter 14 inch
Sub-Item Description Notes Link (URL) Cost Qty Total
4 Sand Media 5 35.00
Cost Breakdown: Sand Media
Sub-Item Description Notes Link (URL) Cost Qty Total
5 Carbon Filter 14 inch 1 930.00
Cost Breakdown: Carbon Filter 14 inch
Sub-Item Description Notes Link (URL) Cost Qty Total
6 Carbon Media 2 250.00
Cost Breakdown: Carbon Media
Sub-Item Description Notes Link (URL) Cost Qty Total
7 Iron Filter 14 inch 1 930.00
Cost Breakdown: Iron Filter 14 inch
Sub-Item Description Notes Link (URL) Cost Qty Total
8 Iron Media 2 350.00
Cost Breakdown: Iron Media
Sub-Item Description Notes Link (URL) Cost Qty Total
9 Softner duplex Filter 18 inch 1 930.00
Cost Breakdown: Softner duplex Filter 18 inch
Sub-Item Description Notes Link (URL) Cost Qty Total
10 Resin 6 370.00
Cost Breakdown: Resin
Sub-Item Description Notes Link (URL) Cost Qty Total
11 Brine Tank and pump 1 700.00
Cost Breakdown: Brine Tank and pump
Sub-Item Description Notes Link (URL) Cost Qty Total
12 Cartridge Filter 4 350.00
Cost Breakdown: Cartridge Filter
Sub-Item Description Notes Link (URL) Cost Qty Total
13 Plumbing Material1 1 10,000.00
Cost Breakdown: Plumbing Material1
Sub-Item Description Notes Link (URL) Cost Qty Total
14 Mobilization 1 1,600.00
Cost Breakdown: Mobilization
Sub-Item Description Notes Link (URL) Cost Qty Total
15 Work Days 7 550.00
Cost Breakdown: Work Days
Sub-Item Description Notes Link (URL) Cost Qty Total
16 ManPower 18 550.00
Cost Breakdown: ManPower
Sub-Item Description Notes Link (URL) Cost Qty Total
17 Housing and Over time 18 200.00
Cost Breakdown: Housing and Over time
Sub-Item Description Notes Link (URL) Cost Qty Total
18 Wrranty and Maint 1 8,000.00
Cost Breakdown: Wrranty and Maint
Sub-Item Description Notes Link (URL) Cost Qty Total
19 Clack Heads for media 4 930.00
Cost Breakdown: Clack Heads for media
Sub-Item Description Notes Link (URL) Cost Qty Total
20 Clack Heads for Softner Twin 2 2,800.00
Cost Breakdown: Clack Heads for Softner Twin
Sub-Item Description Notes Link (URL) Cost Qty Total
21 Heat Exchanger 1 2,500.00
Cost Breakdown: Heat Exchanger
Sub-Item Description Notes Link (URL) Cost Qty Total
Total Est. Cost: 0.00
Total Actual Cost: 0.00
Total Cost Variance: 0.00