Track Actual Costs

Project #65 🔒 Locked 🔓 Admin Edit Mode
← Back to Dashboard
Project: King Abdulaziz Swimming Pool
Customer: Eng. Ahmed Jalal
Date Created: 2026-07-07
Seq Description Qty Est. Cost Actual Unit Cost Actual Total Variance Details
1 Sand Filters 2 5,000.00
Cost Breakdown: Sand Filters
Sub-Item Description Notes Link (URL) Cost Qty Total
2 Chemical Dosing 2 1,500.00
Cost Breakdown: Chemical Dosing
Sub-Item Description Notes Link (URL) Cost Qty Total
3 Heater Pohmen 3 12,000.00
Cost Breakdown: Heater Pohmen
Sub-Item Description Notes Link (URL) Cost Qty Total
4 Heater Main 72KW 1 20,000.00
Cost Breakdown: Heater Main 72KW
Sub-Item Description Notes Link (URL) Cost Qty Total
5 Hotwater Circulation Pump 7 KW 2 15,000.00
Cost Breakdown: Hotwater Circulation Pump 7 KW
Sub-Item Description Notes Link (URL) Cost Qty Total
6 Ciculation PUmp 6.5 KW 2 15,000.00
Cost Breakdown: Ciculation PUmp 6.5 KW
Sub-Item Description Notes Link (URL) Cost Qty Total
7 Panel for all 1 30,000.00
Cost Breakdown: Panel for all
Sub-Item Description Notes Link (URL) Cost Qty Total
Total Est. Cost: 0.00
Total Actual Cost: 0.00
Total Cost Variance: 0.00