Track Actual Costs
Project #65
🔒 Locked
🔓 Admin Edit Mode
← Back to Dashboard
Project:
King Abdulaziz Swimming Pool
Customer:
Eng. Ahmed Jalal
Date Created:
2026-07-07
Seq
Description
Qty
Est. Cost
Actual Unit Cost
Actual Total
Variance
Details
1
Sand Filters
2
5,000.00
+ Add
Cost Breakdown:
Sand Filters
Sub-Item Description
Notes
Link (URL)
Cost
Qty
Total
+ Add Sub-Item
2
Chemical Dosing
2
1,500.00
+ Add
Cost Breakdown:
Chemical Dosing
Sub-Item Description
Notes
Link (URL)
Cost
Qty
Total
+ Add Sub-Item
3
Heater Pohmen
3
12,000.00
+ Add
Cost Breakdown:
Heater Pohmen
Sub-Item Description
Notes
Link (URL)
Cost
Qty
Total
+ Add Sub-Item
4
Heater Main 72KW
1
20,000.00
+ Add
Cost Breakdown:
Heater Main 72KW
Sub-Item Description
Notes
Link (URL)
Cost
Qty
Total
+ Add Sub-Item
5
Hotwater Circulation Pump 7 KW
2
15,000.00
+ Add
Cost Breakdown:
Hotwater Circulation Pump 7 KW
Sub-Item Description
Notes
Link (URL)
Cost
Qty
Total
+ Add Sub-Item
6
Ciculation PUmp 6.5 KW
2
15,000.00
+ Add
Cost Breakdown:
Ciculation PUmp 6.5 KW
Sub-Item Description
Notes
Link (URL)
Cost
Qty
Total
+ Add Sub-Item
7
Panel for all
1
30,000.00
+ Add
Cost Breakdown:
Panel for all
Sub-Item Description
Notes
Link (URL)
Cost
Qty
Total
+ Add Sub-Item
Total Est. Cost:
0.00
Total Actual Cost:
0.00
Total Cost Variance:
0.00
📄 Print / PDF
Save Actuals