Track Actual Costs

Project #73 🔒 Locked 🔓 Admin Edit Mode
← Back to Dashboard
Project: Prince Mansour - Ver 2.0
Customer: Alfaisaliah company
Date Created: 2026-08-06
Seq Description Qty Est. Cost Actual Unit Cost Actual Total Variance Details
1 Water Tank 3000 l 1 2,900.00
Cost Breakdown: Water Tank 3000 l
Sub-Item Description Notes Link (URL) Cost Qty Total
2 Steel base 1 400.00
Cost Breakdown: Steel base
Sub-Item Description Notes Link (URL) Cost Qty Total
3 Pluming material 1 700.00
Cost Breakdown: Pluming material
Sub-Item Description Notes Link (URL) Cost Qty Total
4 Installation 8 850.00
Cost Breakdown: Installation
Sub-Item Description Notes Link (URL) Cost Qty Total
Total Est. Cost: 0.00
Total Actual Cost: 0.00
Total Cost Variance: 0.00