Track Actual Costs

Project #75 🔒 Locked 🔓 Admin Edit Mode
← Back to Dashboard
Project: Pretreatment for Renal Dialysis - Project -Alqasim -1
Customer: MedSurge
Date Created: 2026-08-16
Seq Description Qty Est. Cost Actual Unit Cost Actual Total Variance Details
1 Raw Tank 1000 L 1 650.00
Cost Breakdown: Raw Tank 1000 L
Sub-Item Description Notes Link (URL) Cost Qty Total
2 Booster Pump 2.5hp Booster duty/standby VFD 1 32,500.00
Cost Breakdown: Booster Pump 2.5hp Booster duty/standby VFD
Sub-Item Description Notes Link (URL) Cost Qty Total
3 Sand Filter 16 inch 1 940.00
Cost Breakdown: Sand Filter 16 inch
Sub-Item Description Notes Link (URL) Cost Qty Total
4 Sand Media 7 35.00
Cost Breakdown: Sand Media
Sub-Item Description Notes Link (URL) Cost Qty Total
5 Carbon Filter 16 inch 1 940.00
Cost Breakdown: Carbon Filter 16 inch
Sub-Item Description Notes Link (URL) Cost Qty Total
6 Carbon Media 4 450.00
Cost Breakdown: Carbon Media
Sub-Item Description Notes Link (URL) Cost Qty Total
7 Iron Filter 16 inch 1 940.00
Cost Breakdown: Iron Filter 16 inch
Sub-Item Description Notes Link (URL) Cost Qty Total
8 Iron Media 3 250.00
Cost Breakdown: Iron Media
Sub-Item Description Notes Link (URL) Cost Qty Total
9 Softner duplex Filter 16 inch 2 940.00
Cost Breakdown: Softner duplex Filter 16 inch
Sub-Item Description Notes Link (URL) Cost Qty Total
10 Resin 8 276.00
Cost Breakdown: Resin
Sub-Item Description Notes Link (URL) Cost Qty Total
11 Brine Tank and pump 1 900.00
Cost Breakdown: Brine Tank and pump
Sub-Item Description Notes Link (URL) Cost Qty Total
12 Cartridge Filter 4 250.00
Cost Breakdown: Cartridge Filter
Sub-Item Description Notes Link (URL) Cost Qty Total
13 Plumbing Material1 1 9,000.00
Cost Breakdown: Plumbing Material1
Sub-Item Description Notes Link (URL) Cost Qty Total
14 Mobilization 1 1,600.00
Cost Breakdown: Mobilization
Sub-Item Description Notes Link (URL) Cost Qty Total
15 Work Days 7 550.00
Cost Breakdown: Work Days
Sub-Item Description Notes Link (URL) Cost Qty Total
16 ManPower 18 550.00
Cost Breakdown: ManPower
Sub-Item Description Notes Link (URL) Cost Qty Total
17 Housing and Over time 18 200.00
Cost Breakdown: Housing and Over time
Sub-Item Description Notes Link (URL) Cost Qty Total
18 Wrranty and Maint 1 8,000.00
Cost Breakdown: Wrranty and Maint
Sub-Item Description Notes Link (URL) Cost Qty Total
19 Clack Heads for media 3 950.00
Cost Breakdown: Clack Heads for media
Sub-Item Description Notes Link (URL) Cost Qty Total
20 Clack Heads for Softner Twin 1 2,600.00
Cost Breakdown: Clack Heads for Softner Twin
Sub-Item Description Notes Link (URL) Cost Qty Total
Total Est. Cost: 0.00
Total Actual Cost: 0.00
Total Cost Variance: 0.00