Water Treatment System – Technical Overview & Scope of Work 1. System Description The system delivers softened water up to 15,000 L/h and demineralized (RO product) water up to 1,000 L/h at ≤6 µS/cm conductivity. The RO feed pump supplies raw water to the system at up to 5,000 L/h; RO consumption from this feed is 1,000 L/h, with the balance available for softened water demand / reject. 2. Equipment (Already Supplied) Listed for reference — equipment and pumps are already supplied and are outside the current scope of supply. ItemDescriptionQtyRO Unit1000 L/h, SS frame, control panel with German-manufactured components, Filmatic membranes1Raw Water Tank5,000 L, local manufacture1Soft Water Tank5,000 L, local manufacture1Product Water Tank2,500 L, local manufacture1Booster Pump SetGrundfos, duty/standby with VFD2RO Feed PumpGrundfos, single pump1Sand FilterFRP 14" vessel, Clack WS1 automatic valve1Carbon FilterFRP 14" vessel, Clack WS1 automatic valve1SoftenerFRP 14" vessel, Clack WS1 automatic valve1Brine TankPentair1Cartridge FilterDual housing, 5 micron1Dosing PumpsSupplied complete with treatment chemicals4 3. Scope of Work (Our Scope) Connection of water services to the system inlet(s) inside the RO room, specifically: Tie-in of raw water supply to the RO feed/pretreatment inlet Tie-in of softened water outlet to distribution point Tie-in of RO product water outlet to distribution point Connection of drain line(s) to the room's linear trench drain Pressure/flow verification at each connection point following tie-in 4. Customer-Provided Interface Requirements (at RO room boundary) ServiceRequirementPowerCircuit breaker, 100 ARaw water inlet2" tapping, 4 bar supply pressureRaw water qualityConductivity not exceeding 1000 µS/cm (TDS approx. 600 ppm)Soft water outlet2"RO water inlet/outlet2"Drain4", linear trench drain around inner perimeter of room floor 5. Exclusions (Scope of Work) Civil works and floor trenching/channel construction Supply of pumps and treatment equipment (already supplied) Power cabling beyond the circuit breaker point Piping beyond the stated tapping/connection points Pressure tanks RO membranes Linear/trench drain supply and installation Room tiling, flooring, and waterproofing Ventilation / HVAC for RO room Control system integration with BMS/SCADA Standby power / UPS for control panel 6. Warranty [12] months warranty on all supplied equipment from the date of commissioning. Warranty Exclusions Filter media (sand, carbon, resin) Dosing chemicals (refills) Spare parts / cartridges RO membranes (consumable, subject to raw water quality and usage) Damage caused by raw water quality falling outside the stated design spec (Section 4) Damage caused by power supply outside specified rating or quality